Complete Bottled Water Production Line | Scope & RFQ Example Illustrative purchasing example only—not an installed project, approved configuration or price offer. This example shows how to turn a packaging brief into named quotation items without assuming that every machine in a catalog is required. Example brief: purchased PET bottles, two sizes, one pack type Assume still water in purchased 500 ml and 1 L PET bottles, self-adhesive labels and six-bottle film packs. Both bottle/closure drawings still need approval. Source-water analysis, required output for each size, electrical supply and destination remain unconfirmed. Do not choose a filler model or total price from this brief alone. The worksheet repeats this example and leaves model, quantity, supply status and supplier response blank. Replace the assumptions with your project; blank does not mean included or free. 1. Water preparation and product-water supply How the example changes the schedule: Keep treatment stages, tanks and pumps as unresolved scope; do not automatically select RO. Evidence needed before confirmation: Source-water analysis, required product-water specification and water demand. Model / specification: ____________________ Quantity: ____________________ Supply status: ____________________ Supplier response: ____________________ 2. Purchased-bottle handling How the example changes the schedule: Specify unpacking, orientation and bottle infeed. Exclude onsite blowing from this example; bottle handling is still required. Evidence needed before confirmation: Delivery format of empty bottles, bottle drawings and handling method. Model / specification: ____________________ Quantity: ____________________ Supply status: ____________________ Supplier response: ____________________ 3. Rinsing, filling and capping How the example changes the schedule: Request the named XGF reference and suitable cap feeding, with a separate confirmation for each bottle size. Evidence needed before confirmation: Bottle and cap drawings or samples; required output stated separately for 500 ml and 1 L. Model / specification: ____________________ Quantity: ____________________ Supply status: ____________________ Supplier response: ____________________ 4. Bottle-format parts How the example changes the schedule: Ask which guides, stars and other parts are needed for the second size. Two volumes do not prove a common neck or interchangeable handling. Evidence needed before confirmation: A part-to-format list identifying what changes and what is shared. Model / specification: ____________________ Quantity: ____________________ Supply status: ____________________ Supplier response: ____________________ 5. Self-adhesive labeling How the example changes the schedule: Request an applicator for the actual label and bottle. Do not automatically include a sleeve applicator or shrink tunnel. Evidence needed before confirmation: Label dimensions/material, bottle label panel and required surface condition. Model / specification: ____________________ Quantity: ____________________ Supply status: ____________________ Supplier response: ____________________ 6. Date or batch coding How the example changes the schedule: Specify where the code belongs and what it contains; the printing method is not yet selected. Evidence needed before confirmation: Code content, print area, substrate and readability requirement. Model / specification: ____________________ Quantity: ____________________ Supply status: ____________________ Supplier response: ____________________ 7. Six-bottle film packing How the example changes the schedule: Name the film-packing equipment and confirm a pack drawing for each bottle size, not just “six bottles per pack”. Evidence needed before confirmation: Arrangement, bottle dimensions, film specification and requested finished-pack drawing. Model / specification: ____________________ Quantity: ____________________ Supply status: ____________________ Supplier response: ____________________ 8. Auxiliaries, conveyors, documents and spares How the example changes the schedule: List selected-machine services, transfer equipment, drawings, manuals and spares separately; none is presumed included. Evidence needed before confirmation: Model-specific utility data, equipment layout, document language and itemised spares list. Model / specification: ____________________ Quantity: ____________________ Supply status: ____________________ Supplier response: ____________________ Opens a draft only. Attach your edited text schedule and drawings in your email application; nothing is sent automatically. Allot Tech (Suzhou) Co., Ltd. Mr Kcal sales@allottech.com https://allottech.com/ https://bottledwaterproductionline.com/complete-bottled-water-production-line/