Instrument_ID,Location,Measurand,Intended_use,Criticality,Range,Accuracy_or_tolerance,Method_reference,Calibration_frequency_basis,Reference_standard,Last_due,Next_due,Out_of_tolerance_response,Product_impact_review,Owner,Status,Notes PROJECT_INPUT_REQUIRED,Name process point,Flow_pressure_conductivity_torque_fill_or_other,Describe decision supported,Assign from risk review,Enter verified range,Enter requirement source,Reference approved method,State time_use_event_or_risk basis,Identify traceable reference where required,Record date,Record date,Define containment_and_correction,Define reviewer and lot window,Assign owner,Open,Do not copy a generic interval without intended-use review