Work_pack_ID,Time_window,System,Task,Prerequisite,Isolation_or_permit,Parts_and_tools,Quality_or_hygiene_control,Inspection_hold_point,Responsible_person,Planned_start,Planned_finish,Actual_status,Restart_test,Rollback_or_contingency,Open_action,Release_owner,Notes PROJECT_INPUT_REQUIRED,Define approved outage window,Name affected system,One controlled task per row,List readiness conditions,Reference local permit_and_isolation,Confirm availability and identity,Define contamination_and_release controls,Name witness point,Assign competent role,Record schedule,Record schedule,Open,Define measurable restart evidence,Define safe contingency,Assign owner_due_date_and_effect,Assign authorized release,Coordinate dependencies before freezing the outage