Equipment,Energy_source,Energy_type,Normal_control,Isolation_device,Stored_energy,Release_or_restraint_method,Verification_method,Group_or_shift_rule,Authorized_person,Procedure_reference,Local_law_review,Last_validation,Status,Notes PROJECT_INPUT_REQUIRED,Identify every source,Electrical_pressure_pneumatic_hydraulic_thermal_gravity_mechanical_or_other,Record normal control but do not treat it as isolation,Identify isolating device,Describe residual_or_stored energy,Define approved control,Define zero_energy verification,Reference site rule,Assign competent role,Reference approved procedure,Record competent review,Record witnessed validation date,Open,This planning inventory is not a finished LOTO procedure